Highland Council ePlanning Website – Highland Council Ref: 25/01352/SCOP
Energy Consents Unit Website – ECU Ref: ECU00006129
Beinn Tharsuinn Repowered and Extended Wind Farm – Decommissioning and removal of 17 existing turbines with a maximum blade tip height of 80m and related infrastructure, erection and Operation of up to 31 turbines with a maximum blade tip height 180m, Battery Energy Storage System (BESS) and ancillary infrastructure
For locations of proposed turbines see the map below and for more information on this planning scoping document click attached
