Highland Council ePlanning Website – Highland Council Ref: 25/00709/SCOP
Energy Consents Unit – ECU Ref: ECU00006034
Averon Battery Energy Storage System (BESS) – Erection and Operation of a BESS facility with a maximum capacity of up to 240 MW along with access and ancillary infrastructure
For locations of proposed location of the BESS see the map below and for the up to date information on this application please click the planning links above.

