Highland Council ePlanning Website – Highland Council Ref: 23/02754/S36

Energy Consents Unit Website – ECU Ref: ECU00003466

Abhainn Dubh Wind Farm – Erection and operation of a wind farm for a period of 30 years, comprising of 9 wind turbines (as amended) with a maximum blade tip height of 149.9m, energy storage facility, access tracks, borrow pits, substation, anemometer mast, control building, and ancillary infrastructure.

For locations of proposed turbines see the map below and for the up to date information on this application please click the planning links above.