Windfarm and BESS <200MW Capacity. 27 turbines Max Turbine Height 250 For locations of proposed turbines see the map below and for more information on this application please click the […]
Construction and operation of a Battery Energy Storage System along with associated infrastructure and ancillary works, earthworks, access, drainage, landscaping and biodiversity enhancements. For locations of proposed location of the […]
22 March 2026 – Community update Ceislein Wind Farm – Erection and operation of a wind farm comprising up to 20 turbines with a maximum blade tip height of 250m, […]
22 February 2026 – Ardross Community Update Creachan Wind Farm – RWE have reduced the number of turbines to 13 turbines. 4 turbines up to 180m and 9 turbines up […]
Beinn Tharsuinn Repowered and Extended Wind Farm – Decommissioning and removal of 17 existing turbines with a maximum blade tip height of 80m and related infrastructure, erection and Operation of […]